|
Ammunition storage. These 5 covers needs to replace by new ones
|
|
|
New second hand covers
|
|
Like new
|
|
Bridge wings. This cover is the air
outlet from the ventilation system. Two big vents for air in and out are located under the bridge
|
|
Also a new second hand cover
|
|
Here showing the new cover on the
Starboard side
|
|
To repair the superstructure / deck
welding a 100 mm by 8 mm steel
plate is welded to both. 42 meter total length all around the superstructure.
|
|
|
|
Using the angel grinder to finish it and prepare it fore painting.
|
|
Like new
|
|
Like new
|